Our Packages

Basic Package
ECONOMY
Cost-Plus NEW
₹ 1999* per Sft
Silver Package
CLASSY
Cost-Plus NEW
₹ 2199* per Sft
Gold Package
LUXURY
Cost-Plus NEW
₹ 2499* per Sft

(*)The per square foot value is approximate, the cost-plus model doesn't follow per sft pricing. Refer to our Cost-plus page for details.

Packages Specification

Packages Specification

ECONOMY

  • Brands and Details:
    • Rate - Rs 1999/- per Sft
    • Brick - Red brick (Chamber Burnt Bricks)
    • Cement - ZUARI / CHETTINAD
    • Steel - ARS 550D / GBR 550D
    • Flooring - KAG / CERA Tile Rs.50/Sqft
    • Bathroom Wall Tile - KAG / CERA Tile Rs.40/Sqft
    • Car parking Flooring - KAG / CERA Tile Rs. 40 per Sqft
    • Terrace Flooring - Pressed tile Rs. 12 / piece
    • Kitchen Countertop - Granite Rs. 80 per Sqft
    • Kitchen Sink - Stainless Steel sink
    • Kitchen Sink Faucet - Long-body
    • Staircase - MS Railing / Tiles
    • Main Door - Teak II wood
    • Bedroom Doors - Any Wood frame & flush
    • Bathroom Door - ¾” PVC
    • Windows - Wood with pinhead white colour glass
    • Main Door Lock - GODREJ - SINGLE LEVER
    • Bathroom Sanitary ware - PARRYWARE - IWC & EWC
    • Paint - Exterior - ASIAN / NIPPON
    • Paint - Interior - ASIAN / NIPPON
    • Switches - VEGA
    • Wires - KUNDAN
  • Free Services:
    • 2D - Vastu Plan
    • Isomatric View
    • 3D Elevation Drawing
  • Free:
    • Septic Tank - 4000 litres
    • Hall/ Bedroom Wallpaper
    • UPS Wiring

CLASSY

  • Brands and Details:
    • Rate - Rs 2199/- per Sft
    • Brick - Wire-cut (Chamber Burnt Brick)
    • Cement - CORAMANTAL / DALMIAD
    • Steel - ISTEEL / SAIL / VIZAG
    • Flooring - KAJARIA / JOHNSON /SOMANY Tile Rs.60/Sqft
    • Bathroom Wall Tile - KAJARIA / JOHNSON /SOMANY Tile Rs.50/Sqft
    • Car parking Flooring - KAJARIA / SOMANY Tile Rs.40/Sqft
    • Terrace Flooring - Pressed tile Rs. 17 / piece
    • Kitchen Countertop - Granite Rs. 120 per Sqft
    • Kitchen Sink - Quartz Sink
    • Kitchen Sink Faucet - Swan neck
    • Staircase - SS Railing / One Tiles
    • Main Door - Teak I wood
    • Bedroom Doors - Teak II frame & Compressed wood door
    • Bathroom Door - 1” Designer PVC
    • Windows - Teak II wood / UPVC sliding with pinhead white colour glass
    • Main Door Lock - GODREJ - MULTI LEVER
    • Bathroom Sanitary Ware - JAQUAR - IWC & EWC
    • Paint - Exterior - ASIAN / NIPPON
    • Paint - Interior - ASIAN / NIPPON
    • Switches - ANCHOR / LISHIA
    • Wires - ORBIT FRLS
  • Free Services:
    • 2D - Vastu Plan
    • Isomatric View
    • 3D Elevation Drawing
  • Free:
    • Septic Tank - 4000 litres
    • Hall/ Bedroom Wallpaper
    • UPS Wiring

LUXURY

  • Brands and Details:
    • Rate - Rs 2499/- per Sft
    • Brick - Wire-cut (Chamber Burnt Brick)
    • Cement - ULTRATECH OPC / PPC
    • Steel - TATA TISCON
    • Flooring - KAJARIA / SOMANY Marble Rs. 110 per Sqft
    • Bathroom Wall Tile - KAJARIA / SOMANY Tile Rs. 50 per Sqft
    • Car parking Flooring - Kota stone
    • Terrace Flooring - Ceramic tile Rs. 20 / piece
    • Kitchen Countertop - Quartz
    • Kitchen Sink - Quartz Sink
    • Kitchen Sink Faucet - Pull-out swan neck
    • Staircase - SS Glass Railing / Granite
    • Main Door - Teak I wood
    • Bedroom Doors - Teak II frame & SBD Door
    • Bathroom Door - WPC
    • Windows - Teak I / UPVC with oneway colour glass
    • Main Door Lock - YALE - FINGER PRINT SENSOR
    • Bathroom Sanitary Ware - JAQUAR – IWC & WALL MOUNT EWC
    • Paint - Exterior - ASIAN / NIPPON
    • Paint - Interior - ASIAN / NIPPON
    • Switches - LEGRAND COLOUR SWITCHES
    • Wires - ORBIT FRLS / VGUARD
  • Free Services:
    • 2D - Vastu Plan
    • Isomatric View
    • 3D Elevation Drawing
  • Free:
    • Septic Tank - 4000 litres
    • Hall/ Bedroom Wallpaper
    • UPS Wiring

How It Works?

1
Consultation
2
Review our work
3
Place the order
4
Design
5
Execution & Tracking
6
Move in
Consultation

Consultation

Schedule a personalized consultation with our expert team to discuss your specific requirements, preferences, and vision for your dream home. Our professionals will guide you through the entire process, offering expert insights, tailored recommendations, and the best solutions to bring your ideas to life while ensuring quality, efficiency, and budget alignment.

Advantages Of Cost-Plus Model

Cost-Plus

Lumpsum / Fixed-Price

Money Safety
  • Clients will make payments only after the materials are delivered to their site and the designated work is completed. This ensures that their money remains secure, allowing them to pay only when necessary.
  • Clients must make bulk advance payments upfront, regardless of work progress or completion, which could put their funds at risk without assurance of receiving materials or finished work.
Cost Saving
  • Clients can save up to 10% of the total project cost as payments will be made directly to the vendors.
  • There is no possibility of savings since the project cost is fixed, and clients must pay the agreed amount to the contractor.
High Quality
  • The contractor prioritizes quality over cost-cutting, as their profit is not directly dependent on reducing expenses. This can result in higher workmanship standards and the use of quality materials.
  • In this case, contractors focus on cost-cutting rather than quality, as their profit depends on reducing expenses. This may result in lower workmanship standards and the use of subpar materials.
Client Satisfaction
  • Clients are more likely to be satisfied with the final result, as they can adjust project details as needed.
  • Clients may not be satisfied with the final result due to the inability to modify project details as needed, limiting their flexibility during the construction process.
Transparency
  • Cost-plus contracts offer transparent pricing, giving clients full visibility into project costs, including materials, labor, contractor fees, and design expenses. Detailed cost breakdowns ensure clarity, enabling informed decisions without unexpected costs or hidden charges.
  • Clients may face a lack of pricing transparency, as they might not have full visibility into project costs, including detailed breakdowns of materials, labor, contractor fees, and design expenses. This limited clarity can lead to uncertainties, unexpected costs, and hidden charges, making decision-making more difficult.
Flexibility
  • Cost-plus contracts allow for adjustments and customizations without extensive negotiations. This is especially beneficial for projects requiring personalization, as clients can modify project details, materials, and features throughout the process, adapting to their evolving preferences.
  • Limited flexibility can be a drawback for projects needing customization, as clients may struggle to modify project details, materials, and features during the process, restricting their ability to adapt to changing preferences.
Control over Project
  • The cost-plus model offers enhanced project control, allowing clients to actively participate in decision-making for every aspect of their project. This strengthens their ability to oversee and shape the desired outcomes.
  • Fixed-price models restrict client control over project decisions, limiting their involvement in key aspects of the project. This reduces their ability to influence and oversee outcomes, diminishing their level of empowerment in the process.
Project Time-line
  • In a cost-plus contract, projects often progress faster due to the contract's flexibility. Clients and contractors can make quick decisions and adjustments, fostering seamless collaboration, enhancing efficiency, and ensuring timely completion.
  • Projects may experience slower progress due to the agreement's rigidity. Restricted flexibility in decision-making and adjustments can cause delays, as clients and contractors struggle to adapt to changing circumstances, potentially affecting efficiency and timely completion.
Value Engineering
  • In a cost-plus model, contractors are not bound by a fixed budget, allowing them to propose innovative ideas more freely. Unlike fixed-price contracts, this approach offers greater flexibility and encourages creative solutions. The lack of budget constraints fosters a more dynamic and adaptable project execution.
  • In fixed-price contracts, the set budget limits contractors from suggesting innovative ideas, unlike the flexibility offered by cost-plus models. The strict budget framework can discourage creativity and restrict a dynamic approach to project execution.
Manpower
  • Contractors can strategically deploy skilled manpower, emphasizing the delivery of high-quality work. This approach ensures a focus on expertise and professionalism, ultimately enhancing the project's overall quality.
  • Due to cost minimization constraints, contractors may find it challenging to allocate skilled manpower effectively, which can compromise the emphasis on high-quality work. This limitation may affect overall project quality by reducing the focus on expertise and professionalism.

Why choose Q2builders?

No Subcontractors

No Subcontractors

Professional Project Management

Professional Project Management

Unique And Modern Designs

Unique And Modern Designs

Quality

Quality

Process

Process

Adherence To Timelines

Adherence To Timelines

Competitive Pricing

Competitive Pricing

High-Quality Design

High-Quality Design

Transparency

Transparency

Brand/Trustworthy

Brand/Trustworthy

Professional Customer Service

Professional Customer Service

Hassle-Free Service

Hassle-Free Service

The Q2builders Advantage

Q2builders

Typical Experience

Price
  • Lowest price assurance
  • Transparent pricing
  • Relatively higher costs
  • Increase in cost from initial quote to final price
Quality
  • Premium branded materials
  • Over 320 quality inspections
  • Adherence to ISO quality standards
  • In-house project management with no subcontractors
  • Superior quality finishing
  • Low-quality materials used to reduce costs
  • Absence of quality checks
  • Substandard workmanship
  • Project outsourced to subcontractors
  • Inferior finishing quality
Sub Contractors
  • No subcontractors involved
  • In-house project management with no third-party interference
  • YES
  • Primarily outsourced to subcontractors
Transparency
  • Transparency at every stage
  • Clear pricing, material specifications, process, and execution
  • Little to no transparency
Convenience
  • Comprehensive one-stop solution
  • End-to-end management from plan approval to project handover, ensuring a hassle-free experience
  • Challenging process with little to no support
Design
  • Customized designs and architecture
  • Standardized, repetitive designs and architecture
Timelines
  • Timely project completion with well-defined schedules
  • Consistent updates and real-time project tracking
  • Project delays with inconsistent timelines
  • Lack of clear communication on updates and delays
Warranty
  • 5-year service warranty
  • Dedicated after-sales support
  • No warranty or merely a nominal warranty
  • Absence of after-sales support